End-to-End (E2E) Tests
E2E tests cover multi-node K3s configuration and administration: bringup, update, teardown etc. across a wide range of operating systems. E2E tests are run nightly as part of K3s quality assurance (QA).
Framework
End-to-end tests utilize Ginkgo and Gomega like the integration tests, but rely on Vagrant to provide the underlying cluster configuration.
Currently tested operating systems are:
- Ubuntu 20.04
- Leap 15.3 (stand-in for SLE-Server)
- MicroOS (stand-in for SLE-Micro)
Format
All E2E tests should be placed under tests/e2e/<TEST_NAME>
.
All E2E test functions should be named: Test_E2E<TEST_NAME>
.
A E2E test consists of two parts:
Vagrantfile
: a vagrant file which describes and configures the VMs upon which the cluster and test will run<TEST_NAME>.go
: A go test file which callsvagrant up
and controls the actual testing of the cluster
See the validate cluster test as an example.
Running
Generally, E2E tests are run as a nightly Jenkins job for QA. They can still be run locally but additional setup may be required. By default, all E2E tests are designed with libvirt
as the underlying VM provider. Instructions for installing libvirt and its associated vagrant plugin, vagrant-libvirt
can be found here. VirtualBox
is also supported as a backup VM provider.
Once setup is complete, all E2E tests can be run with:
go test -timeout=15m ./tests/e2e/... -run E2E
Tests can be run individually with:
go test -timeout=15m ./tests/e2e/validatecluster/... -run E2E
#or
go test -timeout=15m ./tests/e2e/... -run E2EClusterValidation
Additionally, to generate junit reporting for the tests, the Ginkgo CLI is used. Installation instructions can be found here.
To run the all E2E tests and generate JUnit testing reports:
ginkgo --junit-report=result.xml ./tests/e2e/...
Note: The go test
default timeout is 10 minutes, thus the -timeout
flag should be used. The ginkgo
default timeout is 1 hour, no timeout flag is needed.