@ -1,6 +1,8 @@
|
|
|
|
|
from typing import List
|
|
|
|
|
import math
|
|
|
|
|
from typing import List
|
|
|
|
|
|
|
|
|
|
from torch.fx.node import Node
|
|
|
|
|
|
|
|
|
|
from .constants import INFINITY_COST
|
|
|
|
|
|
|
|
|
|
|
|
|
|
@ -9,7 +11,7 @@ class CostGraph:
|
|
|
|
|
A graph data structure to simplify the edge cost graph. It has two main functions:
|
|
|
|
|
1. To feed the quadratic resharding costs into solver, we need to linearize it. We build edge_cost in
|
|
|
|
|
CostGraph, and it stored every combinations of strategies for a src-dst node pair in an 1D list.
|
|
|
|
|
2. To reduce the searching space, we merge computationally-trivial operators, such as
|
|
|
|
|
2. To reduce the searching space, we merge computationally-trivial operators, such as
|
|
|
|
|
element-wise operators, transpose, and reduction, into their following nodes. The merging infomation will
|
|
|
|
|
be given by the StrategiesVector depending on the type of target node and following nodes.
|
|
|
|
|
|
|
|
|
@ -75,14 +77,14 @@ class CostGraph:
|
|
|
|
|
def merge_node(self, src_node, dst_node):
|
|
|
|
|
'''
|
|
|
|
|
To merge dst_node into src_node, we need to do it in following steps:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1. For each strategy in dst_node, we need to pick an appropriate strategy
|
|
|
|
|
of src_node to merge, it is important because the logical resharding costs
|
|
|
|
|
between the parents node of src_node and merged node depend on the src_node
|
|
|
|
|
of src_node to merge, it is important because the logical resharding costs
|
|
|
|
|
between the parents node of src_node and merged node depend on the src_node
|
|
|
|
|
strategies dispatching. For example, for the graph 0->1->2, after merging node 1
|
|
|
|
|
into node 2, edge_costs[(node 0, node 2)][(0, 0)] = edge_costs[(node 0, node 1)][(0, x)]
|
|
|
|
|
x represents the picking strategy of node 1 merged into node 2 strategy 0.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2. We need to accumulate the extra costs introduced by merging nodes, the extra costs
|
|
|
|
|
contains two parts, one is resharding costs between src_node strategy and dst_node strategy,
|
|
|
|
|
another is the origin extra costs in src_node strategy.
|
|
|
|
|